How to Calculate Sewage Treatment Plant Capacity

Did you know that an incorrectly sized sewage treatment plant can increase operational costs by up to 40% while potentially violating environmental regulations? Finding the right STP capacity calculator is crucial for facility managers tasked with planning efficient waste management systems.

When undertaking sewage treatment plant sizing, accuracy matters. Many facility managers struggle with how to calculate STP capacity correctly, often overlooking critical factors that influence system performance. Understanding KLD in sewage treatment (Kiloliters per Day) forms the foundation of proper planning, while mastering STP design parameters ensures your facility meets both current needs and future demands.

This comprehensive guide breaks down the complex process of STP capacity calculation into manageable steps, covering the principles of sewage generation, essential calculation parameters, and real-world cost examples. Whether planning a new installation or evaluating an existing system, follow this step-by-step approach to make informed decisions for your sewage treatment requirements.

Understanding Sewage Generation

Wastewater Treatment

Before designing an effective STP capacity calculator, facility managers must grasp the fundamental concepts of sewage generation. Sewage consists of wastewater from households and businesses, possibly including pre-treated industrial wastewater.

Types of Wastewater: Greywater vs Blackwater

  • Greywater: Wastewater from sinks, washing machines, bathtubs, and showers—contains lower contamination and consists largely of soap and detergent residues.

  • Blackwater: Wastewater from toilets, kitchens, and dishwashers—rich in pathogens, bacteria, fecal matter, and grease, requiring robust treatment.

A typical household of four produces about 360 liters of greywater daily, nearly 40% of total household wastewater.

Sources in Buildings

  • Residential Sources: Bathrooms, kitchens, showers, washing machines.

  • Commercial Sources: Restaurants, hotels, hospitals, offices—generally with higher grease, oil, and food waste.

Fact: Approximately 70-90% of the supplied water in any community becomes wastewater, forming a crucial baseline for KLD calculations.

Why Sewage Needs Treatment

Why Sewage Needs Treatment
  • Environmental Protection: Prevents rivers, lakes, and oceans from contamination.

  • Public Health: Reduces waterborne diseases like cholera and typhoid.

  • Resource Conservation: Treated sewage can augment water supply.

  • Regulatory Compliance: Most communities require treating wastewater to remove harmful elements.

Proper sewage handling forms the basis of modern, sustainable facility management.

Key Parameters for STP Calculation

Accurate calculation of sewage treatment plant (STP) capacity relies on three fundamental parameters:

Per Capita Water Consumption (LPCD)

  • Urban Residential: 135-150 LPCD (per CPHEEO recommendations)

  • Rural Areas: 40-75 LPCD

  • Offices: 20-50 LPCD

  • Hospitals: 400-500 LPCD

  • Hotels: 180-250 LPCD

Public usage generally adds about 10 liters per person daily.

Percentage of Water Converted to Sewage

  • Standard Range: 80–90% of water supplied becomes sewage.

  • Factors Influencing Percentage: Evaporation, seepage, leaks, local consumption patterns.

  • Minimum Sewer Design: 100 LPCD (per CPHEEO), regardless of actual consumption.

Certain municipalities may note sewage-to-water ratios above 1.0 due to infiltration and inflow, which must be considered in capacity planning.

Peak Flow Factor (PFF)

  • Represents: Ratio of maximum flow to average flow—accounts for surges in sewage production.

  • Typical Values: 2.0–3.0 for residential sectors; higher for smaller or more variable populations.

  • Formula:
    Peak Flow = Average Daily Flow × Peak Flow Factor

Peak factors are essential for sizing preliminary and primary treatment units.

Step-by-Step STP Capacity Calculation

To ensure accurate sizing, follow these four systematic steps:

1. Estimate Total Water Demand

  • Residential:
    Total Water Demand = Number of Residents × Per Capita Consumption

    E.g., 400 residents × 150 LPCD = 60,000 liters/day

  • Commercial: Use standard usage for staff/guests/students.

2. Calculate Sewage Generation

Typically, 80–90% of consumed water returns as sewage:

Sewage Generation = Total Water Demand × (80–90%)

E.g., 60,000 × 0.8 = 48,000 liters/day

  • Residential: 80%

  • Commercial: 90%

  • Schools: 80%

Follow minimum standards if in doubt.

3. Apply Peak Factor for Design Flow

Peak Flow = Average Sewage Generation × Peak Factor

E.g.,
48,000 × 3.0 = 144,000 liters/day (for peak surges)

Peak factor typically ranges 1.2–3.0, depending on facility type and regulations.

4. Finalize STP Capacity in KLD

Add a 10–15% safety margin for infiltration/inflow and round to the nearest standard size:

STP Capacity = Peak Flow × (1 + Safety Margin)

E.g.,
144,000 × 1.15 = 165,600 liters/day ≈ 165.6 KLD (choose 175 or 200 KLD system if standard increments).

Avoid oversizing or undersizing for optimal efficiency and compliance.

STP Capacity Calculation Table for Different Sectors

Sector Per Capita Water Usage (LPCD) Typical Users Wastewater Coefficient Special Considerations Recommended Peak Factor
180–250
Guests, staff, restaurant patrons
0.85–0.90
Higher grease content from kitchens; fluctuating occupancy rates; additional load from restaurants and laundry facilities
2.0–2.5
45–50 (day scholars), 135 (residential students)
Students, faculty, administrative staff
0.80
Seasonal variations during vacations; peak usage during breaks and lunch hours; sports facilities may add load
2.5–3.0
135–150 (urban), 40–75 (rural)
Residents, visitors, maintenance staff
0.80
Morning and evening peak flows; weekend variations; common facilities like swimming pools increase demand
2.0–3.0
Varies by industry (50–450)
Employees, visitors, process water
0.85–0.95
Pre-treatment often required; chemical composition varies by industry; process water may need separate treatment
1.5–2.0
400–500
Patients, staff, visitors
0.85–0.90
Contains pharmaceutical residues and pathogens; requires specialized treatment; consistent flow throughout day and night
2.0–3.0

Notes:

  • LPCD = Liters per Capita per Day.

  • Wastewater coefficient is the fraction of consumed water that becomes sewage (e.g., 0.8 = 80%).

  • Values are for general planning; always confirm with local standards and industry best practices.

Design and Space Considerations

Proper dimensioning of an STP goes beyond capacity calculations. Once you’ve determined the required KLD, translating this into physical dimensions requires careful consideration of multiple factors.

Standard depth and volume assumptions

Effective STP design begins with standard depth assumptions that balance treatment efficiency with construction costs. Most STP components follow these standard depth guidelines:

  • Liquid depth: 3.0-3.5 meters for aeration tanks
  • Freeboard (additional height): 0.3 meters above liquid level
  • Sedimentation basins: 4.0 meters depth
  • Equalization tanks: designed for 8-12 hours detention time

These standard depths ensure adequate treatment while minimizing excavation costs. Specifically, deeper tanks reduce footprint requirements yet increase construction complexity.

How to estimate area required for STP

To estimate the area needed for your STP, follow this straightforward calculation:

Area (m²) = Volume (m³) ÷ Depth (m)

For example, a 1350m³ STP with 3m depth requires 450m² of surface area. This area is then divided by the assumed width to determine length dimensions. Hence, if the width is set at 15m, the length would be 30m.

The retention time formula provides another essential calculation:

Retention Time (hours) = Tank Volume (m³) ÷ Flow Rate (m³/hour)

Factors affecting tank dimensions

Several key considerations influence final tank dimensions:

  • Site topography– Natural grades should be utilized to minimize construction costs
  • Climate factors– Plant orientation should consider prevailing winds to reduce odors and misting problems
  • Maintenance requirements– Easy accessibility for inspection and repairs is crucial
  • Future expansion– Layout should accommodate potential capacity increases
  • Energy efficiency– Optimizing dimensions can reduce pumping requirements
  • Safety standards– Incorporate anti-slip surfaces and proper railings
  • Treatment process integration– Arrange units for logical progression of sewage flow

The arrangement of treatment units should allow for convenient operation and minimize the need for extensive piping between modules. Moreover, road access must support the largest anticipated delivery and disposal vehicles.

Cost and Real-World Examples

Example 1: Housing Society (100 Apartments)

  • Users: 400; Water: 150 LPCD = 60,000 L/day

  • Sewage (80%): 48,000 L/day

  • Peak Factor (1.2): 57,600 L/day

  • Required STP: 60 KLD (Cost: ₹15–20 lakh)

Example 2: Commercial Building (200 Employees)

  • Water: 10,000 L/day; Sewage: 8,000 L/day

  • Peak Factor (1.2): 9,600 L/day

  • Required STP: 10 KLD (Cost: ₹6–10 lakh)

Capital investment for STP is typically recovered in 18–24 months via water reuse savings. Factors such as automation, treatment technology (e.g., MBBR, SBR, ASP), and site geography influence costs and layout.

Frequently Asked Questions

1. How to calculate required STP capacity?

  • Multiply total users by LPCD.

  • Multiply result by wastewater coefficient (usually 0.8–0.9).

  • Multiply by peak factor.

  • Add safety margin and round up.

2. Most important factors in STP design?

  • Water use rate, user type, wastewater coefficient, occupancy pattern, local rules.

3. Why is the peak factor crucial?

  • Ensures plant handles flow surges during peak hours.

4. What’s unique about industrial STP planning?

  • Higher/variable water use and organic/chemical loads, may need pre-treatment.

5. Common mistakes in STP calculations?

  • Ignoring peak factor, using generic values only, skipping future expansion, neglecting local standards.

Conclusion

Calculating the right STP capacity is essential for building efficient, compliant, and cost-effective sewage treatment systems. By understanding core principles—from sewage generation and per capita consumption, to peak flow factors and safety margins—you can specify the ideal size for any facility.

Space planning, cost estimation, and real-world sector variations must all be factored into your design. Use the tables provided as a quick reference and practical guide. Proper sizing not only supports regulatory compliance but also optimizes resources and ensures sustainability for years to come.

map location

Please feel free to approach us during work hours to discuss your requirements

13
YEARS OF
EXPERIENCE

SUSBIO is available at following locations

SUSBIO : Your partner in Sewage & Wastewater Treatment and recycling

Looking for a trusted Sewage and Wastewater treatment company India? Discover SUSBIO, your go-to expert in FRP Packaged sewage treatment plants. We specialize in designing and delivering efficient systems that handle industrial and domestic waste water effortlessly, transforming it into clean effluent suitable for Reuse applications. 

Head Office - Goa

#5 , Umiya Habitat , Zuarinagar
South Goa , Goa -403725

Manufacturing - Pune

V 130,  Vasuli MIDC,  Vasuli,
Chakan,  Pune- 410510

Mumbai Office

GD-05, Suyog Industrial Estate,
LBS Marg, Vikhroli West,
Mumbai 400083.

HYDERABAD, Telangana

1-5-788, 3c, new maruthi nagar, kothapet, dilsukhnagar, 500060

KOLHAPUR, Maharashatra

ST-01, 1st Floor, Vasant Siddhi Apartment, 6th Lane, Rajarampuri, Kolhapur,416008

kathmandu, NEPAL

Above Sajangoth Sweets, Tripureswor, kathmandu, Nepal

Kozhikode, KERALA

24/11A, Arafa Nagar, Near CUSAT Metro Station, South Kalamassery, Ernakulam, Kerala – 682022 

VARANASI, UP

AN-180, Ashokpuram Bajrang Nagar, Dafi,Varanasi, Uttar Pradesh, India 221011

Hubli-DHARWAD, karnataka

Shivaprasad 103 , 4th Main , Gandhinagar, Dharwad , Karnataka – 580004

SUSBIO LOGO

Empower Change, Save Water with SUSBIO.
For a Sustainable Future.

Advanced Prefabricated Sewage Treatment Plant Manufacturer

Enquiry Form:

    footer image
    Contact us !

    Goa : Head Quarters
    #5 , Umiya Habitat , Zuarinagar
    South Goa , Goa – 403726

    Pune : Factory 
    V 130,  Vasuli MIDC,  Vasuli,
    Chakan,  Pune , Maharashtra – 410510

    Mumbai : Branch Office
    GD-05, Suyog Industrial Estate , LBS Marg Vikhroli West, Mumbai,  Maharashtra – 400083


    Phone : +91 88889 80197 | +9198200 78043 | +9188069 08550

    Email : info@susbio.in