Skip to main content Scroll Top
Goa: #5, Umiya Habitat, Zuarinagar, South Goa | Pune: V130, Vasuli MIDC, Chakan | Mumbai: GD-05, Suyog Industrial Estate, Vikhroli West
  • SUSBIO ECOTREAT
  • CPCB compliant
  • 10-yr warranty

Packaged STP for hotels that guests never notice.

A factory-built Anaerobic + MBBR plant in a 100% FRP shell. It sits under your parking deck or lawn, runs silent and odourless, and is installed in 3–5 days. The treated water goes back to flushing, laundry pre-rinse and landscape.

Typical hotel range: 10–100 KLD. Capacity from 1 to 500 KLD across the ECOTREAT range.

ECOTREAT · FRP Sewage in Installed under lawn or parking deck Treated water to landscape + flushing
3–5 days
Typical installation
<10 mg/L
Outlet BOD
50 yrs
FRP design life
500+
ECOTREAT installations

Built for hotels

Four questions every hotel owner asks.

An STP has to stay out of everyone’s way. Here is how ECOTREAT answers the doubts we hear most.

Will it smell?

Sealed, silent, odourless.

The plant runs inside a closed FRP vessel, rated under 45 dB. It can sit close to the pool or the restaurant terrace.

Where will it fit?

Under the lawn, deck or driveway.

Underground or aboveground installation, with a footprint 40% smaller than a civil STP. Land stays for rooms and amenities.

Who runs it?

Nobody on your payroll.

No permanent on-site operator. IoT and SCADA-ready monitoring, plus lifetime service from SUSBIO.

Will it pass inspection?

Built to CPCB and NGT 2019 norms.

Outlet beats Class A. Our consultancy team handles CTE and CTO paperwork with your state pollution control board.

How it works

Six stages. One FRP vessel.

Dual-stage biological treatment, factory-built and pre-tested, then set into a PCC pit on your site.

  1. Screening

    A 6–25 mm coarse screen stops rags, plastics and kitchen solids.

  2. Primary settling

    A buffer chamber with 4 hr HRT evens out the morning and evening peaks.

  3. Anaerobic reactor

    Hydrolysis and acidogenesis break down the heavy organic load first.

  4. MBBR aeration

    K1/K3 media carriers with 600+ m²/m³ surface area do the fine polishing.

  5. Settler

    The clarifier separates biomass so the water leaving is clear.

  6. Disinfection and reuse

    UV or chlorine polish, then a tank ready for flushing and landscape lines.

Want this under your lawn or parking deck?

Tell us about your hotel. We come back with a model, layout and price in 24 hours.

Water you already paid for

Treat it. Reuse it. Count the points.

Most of the water used in a hotel ends up in the drain. ECOTREAT returns it to work, and the reuse counts toward LEED and EDGE certification.

  • Toilet flushing
  • Landscaping
  • Laundry pre-rinse
  • Pool top-up
  • Cooling-tower make-up
  • HVAC

See which size fits your hotel →

Outlet quality, typical

<10
BOD mg/L (norm: <10)
<50
COD mg/L (norm: <50)
<10
TSS mg/L (norm: <10)
<80
Faecal coliform MPN/100 mL (norm: <100)

Source: SUSBIO ECOTREAT product page. Typical values; actual results depend on inlet quality.

Sizing and price

Find the ECOTREAT for your hotel.

The right size depends on rooms, restaurant covers, laundry and banquet load, so we size it from your numbers. Hotels and resorts typically fall between 10 and 100 KLD. Indicative models below.

ModelCapacityPerson-equivalentFormFootprintIndicative price
EC-10 Popular10 KLD50–60 PECapsule3.4 × 1.8 × 2.0 m₹9 L
EC-15 Popular15 KLD85 PECylinder2.3 m Ø × 3.7 m L₹10.75 L
EC-20 Popular20 KLD110 PECylinder2.3 m Ø × 5 m L₹12.5 L
EC-25 Popular25 KLD140 PECylinder2.5 m Ø × 5 m L₹13.5 L
EC-50 Popular50 KLD250–300 PECylinder2.5 m Ø × 9 m L₹22 L
EC-7575 KLD450 PECylinder2.5 m Ø × 12 m L₹32 L

Prices are indicative (May 2026), inclusive of design, manufacture, installation and commissioning. Transport and civil works are extra. PE is calculated at 180–200 LPCD. Above 75 KLD we build custom skids and multi-unit setups.

Hospitality · Goa · 2024

40 villas. Four leaking septic tanks. One ECOTREAT.

A 25 KLD ECOTREAT under the parking deck replaced the septic tanks. The treated water now irrigates the landscape and tops up the pool.

5 days
Install time
42%
Lower water bill

More from the field

A 15 KLD STP at a Gokarna resort.

See how the Stone Woods resort team handled treatment, reuse and approvals, from site survey to commissioning.

Read the Stone Woods Gokarna case study →

Also on file: a 100 KLD ECOTREAT at a multi-specialty hospital in Chakan, a 200 KLD plant at a pharma campus in Vadodara.

Ready to retire the septic tanks?

Talk to a SUSBIO engineer about your hotel. No obligation.

Installation

From purchase order to commissioning in under 4 weeks.

Most of the time is your civil pad. The plant itself arrives ready and is running within 5 days of delivery.

  1. D-21

    Order and design freeze

  2. D-7

    Civil pad ready

  3. Day 1

    Plant delivered and placed

  4. Day 3

    Plumbing and power

  5. Day 5

    Commission

Hotel STP FAQ

Hotel STP questions, answered.

What owners, project managers and consultants ask us before choosing a packaged sewage treatment plant.

?

Can’t find your question?

Send us your property details. An engineer replies within 24 hours.

Size and cost

What size STP does a hotel need?

Size depends on rooms, restaurant covers, laundry and banquet load. Hotels and resorts typically fall between 10 and 100 KLD. Send us your numbers and we will recommend a model and quote within 24 hours.

How much does a packaged STP cost for a hotel in India?

Indicative SUSBIO ECOTREAT prices run from ₹9 L for 10 KLD to ₹32 L for 75 KLD (May 2026), including design, manufacture, installation and commissioning. Transport and civil works are extra, and the final price depends on your configuration.

Why choose a packaged STP over a civil STP for a hotel?

A packaged plant is factory-built and pre-tested, so it installs in 3–5 days instead of weeks of civil work. Compared with a civil RCC STP, ECOTREAT needs 40% less footprint and 70% less electricity, and runs without a permanent on-site operator.

Installation and comfort

Can a hotel STP be installed underground?

Yes. ECOTREAT is set into a PCC pit and can be installed underground or aboveground. Its footprint is 40% smaller than a civil RCC STP, so land stays free for other uses.

Will an STP smell or make noise near a hotel?

No. The plant runs inside a closed FRP vessel with silent, odourless operation, rated under 45 dB.

How long does it take to install a packaged STP at a hotel?

Installation takes 3–5 days on site once the civil pad is ready. From purchase order to commissioning, plan for under 4 weeks.

Approvals and water reuse

What discharge standards must a hotel STP meet in India?

CPCB norms under NGT 2019 set limits of BOD below 10 mg/L, COD below 50, TSS below 10, total nitrogen below 10, total phosphorus below 1 and faecal coliform below 100 MPN/100 mL. ECOTREAT’s typical outlet sits within every one of these limits.

Does a hotel need pollution control board approval for its STP?

A hotel generally needs Consent to Establish (CTE) and Consent to Operate (CTO) from the state pollution control board. Requirements vary by state and property size. SUSBIO’s consultancy team supports both applications.

Can treated STP water be reused at a hotel?

Yes. Treated water suits toilet flushing, landscaping, laundry pre-rinse, pool top-up, cooling-tower make-up. Reuse also counts toward LEED and EDGE certification.

Operation and service

Does a hotel STP need a full-time operator?

No. ECOTREAT needs no permanent on-site operator. It is IoT and SCADA-ready, so performance can be monitored remotely.

What warranty and service come with a SUSBIO ECOTREAT STP?

A 10-year module warranty and lifetime service from SUSBIO. The FRP vessel is designed for a 50-year life.

Get your quote

Tell us your hotel’s flow. We quote in 24 hours.

Share the basics and an engineer will come back with a model, layout and price. No obligation.

  • Email info@susbio.in
  • Visit Zuarinagar, South Goa · Chakan, Pune · Mumbai

SUSBIO LOGO

Empower Change, Save Water with SUSBIO.
For a Sustainable Future.

Advanced Prefabricated Sewage Treatment Plant Manufacturer

Enquiry Form:

    Hidden fields
    footer image
    Contact us !

    Goa : Head Quarters
    #5 , Umiya Habitat , Zuarinagar
    South Goa , Goa – 403726

    Pune : Factory 
    V 130,  Vasuli MIDC,  Vasuli,
    Chakan,  Pune , Maharashtra – 410510

    Mumbai : Branch Office
    GD-05, Suyog Industrial Estate , LBS Marg Vikhroli West, Mumbai,  Maharashtra – 400083


    Phone : +91 88889 80197 | +9198200 78043 | +9188069 08550

    Email : info@susbio.in