Skip to main content Scroll Top
Goa: #5, Umiya Habitat, Zuarinagar, South Goa | Pune: V130, Vasuli MIDC, Chakan | Mumbai: GD-05, Suyog Industrial Estate, Vikhroli West

Packaged Sewage Treatment Plant (STP) for Industrial Facilities & Manufacturing Plants

  • SUSBIO ECOTREAT
  • CPCB compliant
  • 10-yr warranty

Packaged STP for industries and factory campuses.

Treat the domestic sewage from your workforce in a factory-built Anaerobic + MBBR plant that runs alongside your ETP. Reuse the water in cooling towers and cut freshwater intake. For process effluent, see our ETP range.

Capacity from 1 to 500 KLD. Custom skids and multi-unit setups beyond 500 KLD.

ECOTREAT Ā· FRP Sewage in Installed under lawn or parking deck Treated water to landscape + flushing
3–5 days
Typical installation
<10 mg/L
Outlet BOD
50 yrs
FRP design life
500+
ECOTREAT installations

Built for industries

Four questions every industrial site owner asks.

An STP has to stay out of everyone’s way. Here is how ECOTREAT answers the doubts we hear most.

Will it smell?

Sealed, silent, odourless.

The plant runs inside a closed FRP vessel, rated under 45 dB. It can sit close to offices and the canteen.

Where will it fit?

Under the lawn, deck or driveway.

Underground or aboveground installation, with a footprint 40% smaller than a civil STP. Plant space stays for production.

Who runs it?

Nobody on your payroll.

No permanent on-site operator. IoT and SCADA-ready monitoring, plus lifetime service from SUSBIO.

Will it pass inspection?

Built to CPCB and NGT 2019 norms.

Outlet beats Class A. Our consultancy team handles CTE and CTO paperwork with your state pollution control board.

How it works

Six stages. One FRP vessel.

Dual-stage biological treatment, factory-built and pre-tested, then set into a PCC pit on your site.

  1. Screening

    A 6–25 mm coarse screen stops rags, plastics and kitchen solids.

  2. Primary settling

    A buffer chamber with 4 hr HRT evens out the morning and evening peaks.

  3. Anaerobic reactor

    Hydrolysis and acidogenesis break down the heavy organic load first.

  4. MBBR aeration

    K1/K3 media carriers with 600+ m²/m³ surface area do the fine polishing.

  5. Settler

    The clarifier separates biomass so the water leaving is clear.

  6. Disinfection and reuse

    UV or chlorine polish, then a tank ready for flushing and landscape lines.

Want this under your lawn or parking deck?

Tell us about your industrial site. We come back with a model, layout and price in 24 hours.

Water you already paid for

Treat it. Reuse it. Count the points.

Most of the water used in a industrial site ends up in the drain. ECOTREAT returns it to work, and the reuse counts toward LEED and EDGE certification.

  • Cooling-tower make-up
  • Landscaping
  • Toilet flushing
  • Washing
  • Construction curing

See which size fits your industrial site →

Outlet quality, typical

<8
BOD mg/L (norm: <10)
<40
COD mg/L (norm: <50)
<8
TSS mg/L (norm: <10)
<50
Faecal coliform MPN/100 mL (norm: <100)

Source: SUSBIO ECOTREAT product page. Typical values; actual results depend on inlet quality.

Sizing and price

Find the ECOTREAT for your industrial site.

The right size depends on headcount, canteen, hostel and shift pattern, so we size it from your numbers. Indicative models below.

ModelCapacityPerson-equivalentFormFootprintIndicative price
EC-10 Popular10 KLD50–60 PECapsule3.4 Ɨ 1.8 Ɨ 2.0 m₹9 L
EC-15 Popular15 KLD85 PECylinder2.3 m Ƙ Ɨ 3.7 m L₹10.75 L
EC-20 Popular20 KLD110 PECylinder2.3 m Ƙ Ɨ 5 m L₹12.5 L
EC-25 Popular25 KLD140 PECylinder2.5 m Ƙ Ɨ 5 m L₹13.5 L
EC-50 Popular50 KLD250–300 PECylinder2.5 m Ƙ Ɨ 9 m L₹22 L
EC-7575 KLD450 PECylinder2.5 m Ƙ Ɨ 12 m L₹32 L

Prices are indicative (May 2026), inclusive of design, manufacture, installation and commissioning. Transport and civil works are extra. PE is calculated at 180–200 LPCD. Above 75 KLD we build custom skids and multi-unit setups.

Industrial Ā· Gujarat Ā· 2024

A 200 KLD ECOTREAT beside the main ETP.

A pharma campus in GIDC Vadodara treats its domestic sewage alongside the main ETP. Reusing the water for cooling-tower make-up reduced freshwater intake.

8.4 ML/yr
Freshwater saved
14 months
Payback

Ready to retire the septic tanks?

Talk to a SUSBIO engineer about your industrial site. No obligation.

Installation

From purchase order to commissioning in under 4 weeks.

Most of the time is your civil pad. The plant itself arrives ready and is running within 5 days of delivery.

  1. D-21

    Order and design freeze

  2. D-7

    Civil pad ready

  3. Day 1

    Plant delivered and placed

  4. Day 3

    Plumbing and power

  5. Day 5

    Commission

Industrial site STP FAQ

Industrial site STP questions, answered.

What owners, project managers and consultants ask us before choosing a packaged sewage treatment plant.

?

Can’t find your question?

Send us your property details. An engineer replies within 24 hours.

Size and cost

What size STP does a industrial site need?

Size depends on headcount, canteen, hostel and shift pattern. Send us your numbers and we will recommend a model and quote within 24 hours.

How much does a packaged STP cost for a industrial site in India?

Indicative SUSBIO ECOTREAT prices run from ₹9 L for 10 KLD to ₹32 L for 75 KLD (May 2026), including design, manufacture, installation and commissioning. Transport and civil works are extra, and the final price depends on your configuration.

Why choose a packaged STP over a civil STP for a industrial site?

A packaged plant is factory-built and pre-tested, so it installs in 3–5 days instead of weeks of civil work. Compared with a civil RCC STP, ECOTREAT needs 40% less footprint and 70% less electricity, and runs without a permanent on-site operator.

Installation and comfort

Can a industrial site STP be installed underground?

Yes. ECOTREAT is set into a PCC pit and can be installed underground or aboveground. Its footprint is 40% smaller than a civil RCC STP, so land stays free for other uses.

Will an STP smell or make noise near a industrial site?

No. The plant runs inside a closed FRP vessel with silent, odourless operation, rated under 45 dB.

How long does it take to install a packaged STP at a industrial site?

Installation takes 3–5 days on site once the civil pad is ready. From purchase order to commissioning, plan for under 4 weeks.

Approvals and water reuse

What discharge standards must a industrial site STP meet in India?

CPCB norms under NGT 2019 set limits of BOD below 10 mg/L, COD below 50, TSS below 10, total nitrogen below 10, total phosphorus below 1 and faecal coliform below 100 MPN/100 mL. ECOTREAT’s typical outlet sits within every one of these limits.

Does a industrial site need pollution control board approval for its STP?

A industrial site generally needs Consent to Establish (CTE) and Consent to Operate (CTO) from the state pollution control board. Requirements vary by state and property size. SUSBIO’s consultancy team supports both applications.

Can treated STP water be reused at a industrial site?

Yes. Treated water suits cooling-tower make-up, landscaping, toilet flushing, washing, construction curing. Reuse also counts toward LEED and EDGE certification.

Operation and service

Does a industrial site STP need a full-time operator?

No. ECOTREAT needs no permanent on-site operator. It is IoT and SCADA-ready, so performance can be monitored remotely.

What warranty and service come with a SUSBIO ECOTREAT STP?

A 10-year module warranty and lifetime service from SUSBIO. The FRP vessel is designed for a 50-year life.

Get your quote

Tell us your industrial site’s flow. We quote in 24 hours.

Share the basics and an engineer will come back with a model, layout and price. No obligation.

  • Email info@susbio.in
  • Visit Zuarinagar, South Goa Ā· Chakan, Pune Ā· Mumbai

SUSBIO LOGO

Empower Change, Save Water with SUSBIO.
For a Sustainable Future.

Advanced Prefabricated Sewage Treatment Plant Manufacturer

Enquiry Form:

    Hidden fields
    footer image
    Contact us !

    Goa : Head Quarters
    #5 , Umiya Habitat , Zuarinagar
    South Goa , Goa – 403726

    Pune : Factory 
    V 130,  Vasuli MIDC,  Vasuli,
    Chakan,  Pune , Maharashtra – 410510

    Mumbai : Branch Office
    GD-05, Suyog Industrial Estate , LBS Marg Vikhroli West, Mumbai,  Maharashtra – 400083


    Phone : +91 88889 80197 | +9198200 78043 | +9188069 08550

    Email : info@susbio.in