- SUSBIO ECOTREAT
- CPCB compliant
- 10-yr warranty
Packaged STP for resorts, built to blend into the landscape.
A factory-built Anaerobic + MBBR plant in a 100% FRP shell, buried below lawns, villas or parking. Silent and odourless, installed in 3–5 days. The treated water irrigates the grounds and tops up the pool.
Typical resort range: 10–100 KLD. Capacity from 1 to 500 KLD across the ECOTREAT range.
Built for resorts
Four questions every resort owner asks.
An STP has to stay out of everyone’s way. Here is how ECOTREAT answers the doubts we hear most.
Will it smell?
Sealed, silent, odourless.
The plant runs inside a closed FRP vessel, rated under 45 dB. It can sit close to villas, the pool or the dining deck.
Where will it fit?
Under the lawn, deck or driveway.
Underground or aboveground installation, with a footprint 40% smaller than a civil STP. The grounds stay green and open.
Who runs it?
Nobody on your payroll.
No permanent on-site operator. IoT and SCADA-ready monitoring, plus lifetime service from SUSBIO.
Will it pass inspection?
Built to CPCB and NGT 2019 norms.
Outlet beats Class A. Our consultancy team handles CTE and CTO paperwork with your state pollution control board.
How it works
Six stages. One FRP vessel.
Dual-stage biological treatment, factory-built and pre-tested, then set into a PCC pit on your site.
- 01
Screening
A 6–25 mm coarse screen stops rags, plastics and kitchen solids.
- 02
Primary settling
A buffer chamber with 4 hr HRT evens out the morning and evening peaks.
- 03
Anaerobic reactor
Hydrolysis and acidogenesis break down the heavy organic load first.
- 04
MBBR aeration
K1/K3 media carriers with 600+ m²/m³ surface area do the fine polishing.
- 05
Settler
The clarifier separates biomass so the water leaving is clear.
- 06
Disinfection and reuse
UV or chlorine polish, then a tank ready for flushing and landscape lines.
Want this under your lawn or parking deck?
Tell us about your resort. We come back with a model, layout and price in 24 hours.
Water you already paid for
Treat it. Reuse it. Count the points.
Most of the water used in a resort ends up in the drain. ECOTREAT returns it to work, and the reuse counts toward LEED and EDGE certification.
- Landscaping
- Pool top-up
- Toilet flushing
- Laundry pre-rinse
- Cooling-tower make-up
Outlet quality, typical
Source: SUSBIO ECOTREAT product page. Typical values; actual results depend on inlet quality.
Sizing and price
Find the ECOTREAT for your resort.
The right size depends on rooms, villas, restaurant covers, laundry and event load, so we size it from your numbers. Hotels and resorts typically fall between 10 and 100 KLD. Indicative models below.
| Model | Capacity | Person-equivalent | Form | Footprint | Indicative price |
|---|---|---|---|---|---|
| EC-10 Popular | 10 KLD | 50–60 PE | Capsule | 3.4 × 1.8 × 2.0 m | ₹9 L |
| EC-15 Popular | 15 KLD | 85 PE | Cylinder | 2.3 m Ø × 3.7 m L | ₹10.75 L |
| EC-20 Popular | 20 KLD | 110 PE | Cylinder | 2.3 m Ø × 5 m L | ₹12.5 L |
| EC-25 Popular | 25 KLD | 140 PE | Cylinder | 2.5 m Ø × 5 m L | ₹13.5 L |
| EC-50 Popular | 50 KLD | 250–300 PE | Cylinder | 2.5 m Ø × 9 m L | ₹22 L |
| EC-75 | 75 KLD | 450 PE | Cylinder | 2.5 m Ø × 12 m L | ₹32 L |
Prices are indicative (May 2026), inclusive of design, manufacture, installation and commissioning. Transport and civil works are extra. PE is calculated at 180–200 LPCD. Above 75 KLD we build custom skids and multi-unit setups.
Hospitality · Goa · 2024
40 villas. Four leaking septic tanks. One ECOTREAT.
A 25 KLD ECOTREAT under the parking deck replaced the septic tanks. The treated water now irrigates the landscape and tops up the pool.
More from the field
A 15 KLD STP at a Gokarna resort.
See how the Stone Woods resort team handled treatment, reuse and approvals, from site survey to commissioning.
Read the Stone Woods Gokarna case study →
Also on file: a 100 KLD ECOTREAT at a multi-specialty hospital in Chakan, a 200 KLD plant at a pharma campus in Vadodara.
Ready to retire the septic tanks?
Talk to a SUSBIO engineer about your resort. No obligation.
Installation
From purchase order to commissioning in under 4 weeks.
Most of the time is your civil pad. The plant itself arrives ready and is running within 5 days of delivery.
- D-21
Order and design freeze
- D-7
Civil pad ready
- Day 1
Plant delivered and placed
- Day 3
Plumbing and power
- Day 5
Commissioned
Resort STP FAQ
Resort STP questions, answered.
What owners, project managers and consultants ask us before choosing a packaged sewage treatment plant.
Can’t find your question?
Send us your property details. An engineer replies within 24 hours.
Size and cost
01What size STP does a resort need?
Size depends on rooms, villas, restaurant covers, laundry and event load. Hotels and resorts typically fall between 10 and 100 KLD. Send us your numbers and we will recommend a model and quote within 24 hours.
02How much does a packaged STP cost for a resort in India?
Indicative SUSBIO ECOTREAT prices run from ₹9 L for 10 KLD to ₹32 L for 75 KLD (May 2026), including design, manufacture, installation and commissioning. Transport and civil works are extra, and the final price depends on your configuration.
03Why choose a packaged STP over a civil STP for a resort?
A packaged plant is factory-built and pre-tested, so it installs in 3–5 days instead of weeks of civil work. Compared with a civil RCC STP, ECOTREAT needs 40% less footprint and 70% less electricity, and runs without a permanent on-site operator.
Installation and comfort
04Can a resort STP be installed underground?
Yes. ECOTREAT is set into a PCC pit and can be installed underground or aboveground. Its footprint is 40% smaller than a civil RCC STP, so land stays free for other uses.
05Will an STP smell or make noise near a resort?
No. The plant runs inside a closed FRP vessel with silent, odourless operation, rated under 45 dB.
06How long does it take to install a packaged STP at a resort?
Installation takes 3–5 days on site once the civil pad is ready. From purchase order to commissioning, plan for under 4 weeks.
Approvals and water reuse
07What discharge standards must a resort STP meet in India?
CPCB norms under NGT 2019 set limits of BOD below 10 mg/L, COD below 50, TSS below 10, total nitrogen below 10, total phosphorus below 1 and faecal coliform below 100 MPN/100 mL. ECOTREAT’s typical outlet sits within every one of these limits.
08Does a resort need pollution control board approval for its STP?
A resort generally needs Consent to Establish (CTE) and Consent to Operate (CTO) from the state pollution control board. Requirements vary by state and property size. SUSBIO’s consultancy team supports both applications.
09Can treated STP water be reused at a resort?
Yes. Treated water suits landscaping, pool top-up, toilet flushing, laundry pre-rinse, cooling-tower make-up. Reuse also counts toward LEED and EDGE certification.
Operation and service
10Does a resort STP need a full-time operator?
No. ECOTREAT needs no permanent on-site operator. It is IoT and SCADA-ready, so performance can be monitored remotely.
11What warranty and service come with a SUSBIO ECOTREAT STP?
A 10-year module warranty and lifetime service from SUSBIO. The FRP vessel is designed for a 50-year life.
Get your quote
Tell us your resort’s flow. We quote in 24 hours.
Share the basics and an engineer will come back with a model, layout and price. No obligation.
- Email info@susbio.in
- Visit Zuarinagar, South Goa · Chakan, Pune · Mumbai
SUSBIO ECOTREAT